Instow to Appledore (<-->)
(Our overall day number 29 - Part of The KC3 ECP Leg 4b - Braunton to Hartland Quay)Instow to Appledore (<-->)
19th May 2023 | Miles 7.1 | Elevation gain 344ft
A 7.1 miles walk around the River Torridge Estuary, into Bideford, across the Long Bridge, and then back up the east bank of the Torridge to Instow, in time for a quick pint and then the tidal ferry back to Appledore.
Getting there and back
We walked from our accommodation, and then caught the tidal ferry back to Appledore. Our plan for this day revolved around the timing of the Instow-Appledore ferry, which only runs for a couple of hours each side of high tide – and, as we arrived mid afternoon, this meant that we had to walk this section in the wrong direction (clockwise) - can be done either direction depending on the tide!
Weather conditions
Fine weather, some blue skies. Chilled off in the evening while waiting for the ferry!
Walking difficulty
Easy - one or two little inclines on the Appledore side of the estuary, maximum elevation 101ft
The story of our day in photos
.jpg)
Heading out mid-afternoon from Appledore
.jpg)
The streets of Appledore
.jpg)
Our destination - Instow - across the River Torridge. So close but still so far.
.jpg)
Looking towards the Torridge Bridge, where the A39 crosses the river
.jpg)
Looking across the River Torridge towards the village of Westleigh
.jpg)
Walking under the A39 - another mile to our crossing point
.jpg)
Tide rising near Bideford
.jpg)
Bideford Long Bridge - that's our crossing point
.jpg)
Ice cream stop in Bideford
.jpg)
.jpg)
Walking done - and waiting for the ferry at Instow
.jpg)
Looking out from Appledore - the tide by now very full
Useful links